Procurve 2224 manual




















ProCurve GL, StoreFabric SNB, Dev'essere installato un collegamento a terra di sicurezza, non interrompibile che vada dalla fonte d'alimentazione principale ai terminali d'entrata, al cavo d'alimentazione oppure al set cavo d'alimentazione fornito con il prodotto.

Off The switch is NOT receiving power. Fault orange Off The normal state; indicates that there are no fault conditions on the switch. If the transceiver … 9. All rights reserved. Reproduction, adaptation, or translation without prior written permission is prohibited except as allowed under the copyright laws. The rest of this chapter provides details on these steps.

Prepare the installation site. Make sure that the physical environment into which you will be installing the switch is properly prepared including having the correct network cabling ready to connect to the switch, and … Pins 4, 5, 7, and 8 are not used in this application, although they may be wired in the ca … In this case, it sends the packet to all the other switch ports. Verify the Switch Operates Correctly After you have optionally installed a transceiver module, but before mounting the switch in its network location, you should first check that it is working properly by plugging it into a power source and verifying that it passes its self test.

Connect the power cord supplied with the switch to the power connector on the back of the switch, and then into a nearby properly grounded electr … It comes with an accessory kit that includes the brackets for mounting the switch in a standard inch telco rack or an equipment cabinet, or on a wall, and with rubber feet that can be attached so the switch can be securely located on a horizontal surface.

The brackets are designed to allow mounting the switch in a variety of orientations. This chapter shows you how to install your Switch Included Parts The Switch has the following components shipped … Try power cycling the switch.

If the fault indication reoccurs, the switch may have failed. Try resetting the switch by pressing the Reset button on the front of the … This action clears any temporary error conditions that may have occurred, and executes the switch self test. As a Desktop Switch The Switch is designed to be used primarily as a desktop switch to which end nodes, printers and other peripherals, and servers are directly connected, as shown in the above illustration.

Power Connector The Switch does not have a power switch; it is powered on when connected to an active AC power source. Next Page. Routing switches software release 7. Page 4 A copy of the specific warranty terms applicable to your Hewlett-Packard products and replacement parts can be obtained from your HP Sales and Service Office or authorized dealer.

This switch is a store-and- forward device that offers low latency for high-speed networking. Fault The normal state; indicates that there are no fault conditions on the switch.

The switch automatically adjusts to any voltage between and volts and either 50 or 60 Hz. It comes with an accessory kit that includes the brackets for mounting the switch in a standard inch telco rack or an equipment cabinet, or on a wall, and with rubber feet that can be attached so the switch can be securely located on a horizontal surface. Page Installation Procedures Optional Install the transceiver module. Depending on where you will locate the Switch , it may be easier to install the transceiver first.

Prepare the Installation Site Cabling Infrastructure - Ensure that the cabling infrastructure meets the necessary network specifications. Install An Optional Transceiver Install an optional transceiver module into the transceiver slot as shown in the illustration below, or by following the instructions in the manual that comes with the transceiver.

The slot cover can be removed with either a flat-bladed or Torx T screw- driver. Verify the Switch Operates Correctly After you have optionally installed a transceiver module, but before mounting the switch in its network location, you should first check that it is working properly by plugging it into a power source and verifying that it passes its self test.

The self test takes approximately 3 seconds to complete. Mount the Switch After a transceiver has been installed and you have verified that the switch passes its self test, you are ready to mount the switch in a stable location. The Switch can be mounted in these ways: in a rack or cabinet on a horizontal surface on a wall Ensure that the screws are at the same level in each upright.

Page 24 Installing the Switch Installation Procedures Install the other number screw into the upper hole in each bracket. Tighten these screws.

When power is on for the switch and for the connected device, the Link LED for the port should light to confirm a powered-on device for Page Connecting To A Backbone Switch The simpler desktop and segment networks shown in the previous two examples can easily be combined and expanded.

For example, you could use an HP ProCurve Switch M to interconnect each of your smaller switched workgroups to form a larger switched network. All the devices in this network can communicate with each other.

Page Troubleshooting page diagnosing with the LEDs page hardware diagnostic tests page HP Customer Support Services page Basic Troubleshooting Tips Most problems are caused by the following situations: Incorrect switch-to-switch or switch-to-hub connections. If you Page 32 Refer to the Network Design Guide for topology configuration guidelines.

Page Diagnosing With The Leds If the power source and power cord are OK and this condition persists, the switch power supply may have failed. N o t e Make sure that you are using the correct cabling type for each connection.



0コメント

  • 1000 / 1000